The Event
Fire within hay shed.
Cause & Effect
The fire completely destroyed the building with no prospect of salvaging any aspect the original building.
The Outcome
Due to strategic importance of the damaged building for the owner and the requirement of continued operation of the site, additional structures were altered to enable continuation of operations.
A complete replacement building was designed and fully documented with construction deadline imperatives which needed to be met.
Services Provided
- Liaison with all stakeholders, including owner, Insurer, fire and mechanical engineering consultants, CFS and the local approving authority.
- Preparation of complete architectural and structural design services including detailed scope of work and specification for the replacement building.
- Coordination of and obtaining approval for the structure, including extensive construction phase services including site inspection during the works.